The spice grinding machine must be familiar with the general structure and performance of the equipment during the operation. The equipment must not be used in super performance. The sum of the parts and the grinding machine must not exceed 90% of the hopper volume. After the power is turned on, it needs to be idling, and it should run smoothly without abnormal noise.

Before the grinding, the spice grinding machine must be degreased and decontaminated during the operation. During the processing, it is necessary to add the abrasive and control the amount of water according to the grinding condition of the workpiece. When the work is finished, stop the power supply, clean the equipment, and do the equipment maintenance work. Safety Operation Procedure Before starting the machine, check the fastening screws and check whether the rotation of the motor shaft is flexible. When the equipment is in operation, it should be stopped when it is found to be abnormal. Every 6 months, the grease fill of the bearing of the vibration motor or rotating shaft should be filled with lithium grease. When you get off work, you should turn off the power.

The empty load test run of the spice grinding machine has its main engine and analysis turned correctly. The main engine empty load test run is not less than 1 h according to its steering requirements. When the main engine is running at an empty load, the steel roller should be tightened with the steel wire rope to avoid contact between the grinding roller and the grinding ring. If the condition is unconditional, the grinding roller device can be removed. The main engine air load test should be stable, and the maximum temperature of the lubricating oil should not exceed 800c.

The spice grinding machine proves that the various components can work normally after passing through its empty load test run, so that the test run can be carried out, and the test run time is not less than 8h (hours). The mill should work normally, and the transmission part must not have abnormal sound and shock vibration. The maximum temperature of rolling bearings and lubricating oil does not exceed 800c, and the temperature rise does not exceed 400c. There should be no air leakage in the contact of the flanges in the pipeline installation.