Installation steps of air classifier mill

Apr 16, 2025

1. Preparation before installation
Read the installation manual of the equipment in detail and be familiar with the structure and installation requirements of the equipment. Check whether all parts of the equipment are complete and whether there is any damage or deformation. Prepare the tools required for installation, such as wrenches, screwdrivers, cranes, etc. According to the installation size of the equipment, determine the appropriate installation location at the installation site, and ensure that the installation foundation is firm and flat, and can withstand the weight and vibration of the equipment during operation.

 

2. Main unit installation
Use a crane to smoothly lift the main unit of the air classifier mill to the installation foundation, and adjust the position of the main unit so that its center line is aligned with the positioning line on the installation foundation. Use a level to check the levelness of the main unit, and adjust the horizontal state of the main unit by inserting a gasket of appropriate thickness at the bottom of the main unit to ensure that the horizontal error of the main unit is within the specified range. Then, use anchor bolts to fix the main unit on the installation foundation, and tighten the anchor bolts according to the specified torque to fix the main unit firmly on the installation foundation.

 

3. Classification system installation
Assemble the various components of the classification system, such as the classification impeller, classification housing, etc., according to the requirements of the installation manual. During the assembly process, pay attention to the tight connection between the components and good sealing to prevent material leakage and airflow short circuits. After the assembly is completed, install the grading system on the main machine, ensure that the connection between the grading system and the main machine is accurate, and use bolts to fix it firmly.
Installation of airflow conveying system: Install the air intake pipe and exhaust pipe to ensure that the pipeline is firmly connected and well sealed. According to the operating requirements of the equipment, arrange the pipeline direction reasonably to avoid sharp turns or long horizontal sections in the pipeline to reduce airflow resistance. Install necessary valves and regulating devices on the pipeline to control the flow and pressure of the airflow. Connect the fan and the pipeline to ensure that the rotation direction of the fan is correct and firmly installed.

 

Air Classifying Mill-Baoli Machinery

 

4. Electrical system installation
According to the electrical wiring diagram, connect the power cable and control cable of the equipment. Ensure that the wiring is firm and well-insulated to prevent leakage. Install the control cabinet and fix it in a suitable position for the operator to operate and observe the operating status of the equipment. Install various electrical components in the control cabinet and debug them to ensure that the electrical control system of the equipment works normally.

 

5. Post-installation inspection and debugging
After installation, conduct a comprehensive inspection of the equipment to ensure that all components are firmly installed, the connection parts are well sealed, and the pipelines and electrical lines are reasonably arranged. When the equipment is unloaded, start the fan and the main engine, check the operation of the equipment, and observe whether there is any abnormal noise, vibration, or jamming.

 